Jiangxi JDL Environmental Protection Co., Ltd

Chinese English
Existing Plant Upgrading
HOME
Case Studies
Existing Plant Upgrading

Jiangxi Province Huichang County Sewage Treatment Project


Huichang WWTP had built . After population growth and new, more restrictive regulations, the original WWTP design was unable to meet the city??s requirements. The plant needed to upgrade to Class A in terms of flow and discharge permit. Thus the new wastewater treatment facility was constructed in 2015 with a design flow of 2.64MGD. FMBR was selected due to its excellent effluent quality and small footprint as well as the short construction period without interrupting existing plant operation. The FMBR process has the advantages of short construction period, small foot print, and simple operation.


 14e2580829a5f66d528c01340ff50188.jpg